At the end of 2015, and in the last 8 years, the business had been growing significantly but at the same time there was growing stress on the manufacturing operation. They have had shortages in key components and increases in the lead time for chair production. They needed to increase the staff significantly without time for training them. The stock levels of raw components and part-finished goods within the factory began to increase dramatically, and that led to the need for more storage space. At the same time as stock levels grew, the quality control staff were noticing more and more defects in the final product. Re-work levels of these defected parts were growing and so too were the production costs and indeed the stress levels of those working in the company.
Seating Matters
Información del caso
Páginas:
10
Código:
PI-203-E
- Áreas: Dirección de Producción, Tecnología y Operaciones
- Idiomas: Español
- Recursos: Vista previa
- Temas: Continuous Improvement, Craft Production, Family Business, Health sector, Innovation, Lean Manufacturing
SOLICITA EL CASO
Seating Matters
Casos relacionados
Código:
PI-217
Áreas:
- Dirección de Producción, Tecnología y Operaciones
Idiomas:
- Español
Recursos:
- Vista previa
Temas:
- Cadena de Suministro, Cadena de Valor, Cambio de hábitos de los consumidores, Diversificación, Innovación, Modelo de negocio
Código:
CIN-12
Áreas:
- Control
Idiomas:
- Español
Recursos:
- Vista previa
Temas:
- Desempeños y resultados, Ejecución de la estrategia, Execution, Implantación de la estrategia, Sistemas de control, Sistemas de direccion, Sistemas Interactivos, Strategy execution
Código:
DGI-12
Áreas:
- Política de Empresa
Idiomas:
- Español
Recursos:
- Vista previa
Temas:
- Diseño, Estrategia corporativa, Infraestructura, Política Empresa, Unidades de negocio